← Insights

Five ways to cut HVAC energy before you spend a penny on plant

Schedules, setpoints, dead bands, optimum start and sequencing. The unglamorous wins hiding in your existing BMS.

EcoNex engineering team • 15 January 2026 • 6 min read

Five ways to cut HVAC energy before you spend a penny on plant

Before anyone specifies a new chiller, it is worth checking what the existing controls are being asked to do. On almost every estate we survey, there is double-digit energy waste locked up in settings nobody has revisited since handover.

The five checks

  • Occupancy schedules that match how the building is actually used today
  • Heating and cooling setpoints with a real dead band between them
  • Optimum start and stop enabled and tuned to the fabric
  • Simultaneous heating and cooling designed out at zone level
  • Plant sequencing so lead machines rotate and part-load is efficient

None of that needs capital expenditure. It needs someone with access to the supervisor and a week of attention.

Get started

Let's talk about
your building

Tell us what the building needs to do. We'll tell you what it takes - design, installation, commissioning, electrical works and maintenance from one team.

01DesignSpecs, points lists and drawings
02BuildInstallation and electrical works
03DeliverInstall, commission, maintain

London & the South East - 24/7 reactive cover