Commissioning is not a week at the end of the job

Seasonal fine-tuning, witnessed testing and soft landings - why the last 5% of a project decides how the building performs.

EcoNex engineering team21 March 20264 min read

Commissioning is not a week at the end of the job

Programmes routinely allow two weeks for BMS commissioning at the very end, after every other trade has overrun into that window. The result is a building that technically works and practically doesn't.

Commissioning should start at design stage. If the control strategy is written with witnessing in mind - measurable setpoints, defined sequences, clear pass criteria - the site phase becomes verification rather than invention.

Soft landings pay for themselves

Returning after the first heating season to retune setpoints, schedules and optimum start is the cheapest energy project available to any building owner. We build it into our handover as standard.

Get started

Let's talk about
your building

Tell us what the building needs to do. We'll tell you what it takes - design, installation, commissioning, electrical works and maintenance from one team.

01DesignSpecs, points lists and drawings
02BuildInstallation and electrical works
03DeliverInstall, commission, maintain

London & the South East - 24/7 reactive cover