BMS Retrofit Projects in a commercial building

Service 07 of 07

BMS Retrofit Projects

Replacing the brain of a building without closing it

Directly employed

engineers on site

Live buildings

phased and out of hours

Documented

test sheets and as-builts

London

and the South East

Overview

Retrofit is our specialism. We replace end-of-life control systems in occupied buildings, working out of hours and in phases so tenants keep heating, cooling and ventilation throughout the programme.

What we deliver

  • 01Head-end and controller replacement
  • 02Phased, out-of-hours changeover programmes
  • 03Reuse of serviceable field devices and wiring
  • 04Legacy protocol interfacing during transition
  • 05Landlord and tenant liaison
  • 06Net zero and energy reduction driven upgrades

How it works

Our approach to BMS Retrofit Projects

01

Condition survey

Existing system assessed for what can be kept and what must go.

02

Phasing

Programme built around occupancy, plant redundancy and risk.

03

Changeover

Out-of-hours swaps with fallback plans for every phase.

04

Optimise

Post-completion tuning to lock in the energy savings.

Related services

View all services →

Get started

Let's talk about
your building

Tell us what the building needs to do. We'll tell you what it takes - design, installation, commissioning, electrical works and maintenance from one team.

01DesignSpecs, points lists and drawings
02BuildInstallation and electrical works
03DeliverInstall, commission, maintain

London & the South East - 24/7 reactive cover