Trend IQ Upgrades in a commercial building

Service 04 of 07

Trend IQ Upgrades

Keep the field wiring. Lose the obsolescence risk.

Directly employed

engineers on site

Live buildings

phased and out of hours

Documented

test sheets and as-builts

London

and the South East

Overview

Ageing Trend IQ1, IQ2 and IQ3 estates still run thousands of buildings. We upgrade controllers, supervisors and networks to current IQ4 and IQ Vision platforms, reusing existing field wiring and devices wherever possible to keep cost and disruption down.

What we deliver

  • 01IQ1 / IQ2 / IQ3 to IQ4 controller upgrades
  • 02963 supervisor to IQ Vision migration
  • 03Strategy conversion and re-engineering
  • 04Network health checks and Lan/Inter-Lan rationalisation
  • 05Phased upgrades on live, occupied buildings
  • 06Cyber-hardened, IP-ready architecture

How it works

Our approach to Trend IQ Upgrades

01

Audit

Full controller, supervisor and network inventory with obsolescence risk rating.

02

Plan

Phased upgrade programme costed and sequenced around building occupancy.

03

Convert

Strategies migrated, tested offline, then swapped over out of hours.

04

Verify

Point-to-point proving and graphics rebuilt to match the new platform.

In detail

Upgrading Trend IQ controllers without starting again

Many London buildings still run on older Trend IQ controllers that are hard to support and hard to integrate. A Trend IQ upgrade replaces or modernises the controllers while keeping the existing wiring, field devices and much of the strategy.

The result is a supported, better performing system at a fraction of the cost and disruption of a full replacement.

Typical projects

  • IQ2 and IQ3 controller replacement with current Trend hardware
  • Supervisor and front end upgrades
  • Strategy review and energy saving improvements during upgrade
  • Phased upgrades floor by floor in occupied buildings

Standards and ways of working

  • ✓Trend manufacturer guidance and hardware compatibility
  • ✓Documented point-to-point testing after changeover
  • ✓Updated strategy files, drawings and O&M records
  • ✓Open protocol integration where needed

Trend IQ Upgrades questions

Do we need to replace all the wiring?+

Usually not. Most upgrades reuse the existing field wiring and devices, which keeps cost and disruption down.

Will the building stay running during the upgrade?+

Yes. Controllers are changed over one at a time or in phases, normally out of hours.

Can the strategy be improved at the same time?+

Yes. An upgrade is a good moment to fix control issues and add energy saving features.

How do we know if our Trend system needs upgrading?+

Common signs are unsupported controllers, failing hardware, a slow front end or difficulty getting spares. We can survey the system and advise.

Related services

View all services →

Get started

Let's talk about
your building

Tell us what the building needs to do. We'll tell you what it takes - design, installation, commissioning, electrical works and maintenance from one team.

01DesignSpecs, points lists and drawings
02BuildInstallation and electrical works
03DeliverInstall, commission, maintain

London & the South East - 24/7 reactive cover