The Shard cooling tower control upgrade
Existing cooling tower control panel removed and replaced with a new bespoke panel, stainless steel containment and fully commissioned EC fan control.
Client
The Shard
Location
London Bridge, London
Year
2026
Value
Bespoke panel & controls
The challenge
The cooling tower controls had reached the end of their serviceable life on one of the most demanding buildings in London, with no room for extended downtime or untidy workmanship in an exposed rooftop environment.
What we did
We removed the existing panel, then designed, manufactured and installed a replacement bespoke control panel. New stainless steel containment and field cabling were installed, EC cooling tower fans integrated and the complete system commissioned.
Outcome
- New bespoke control panel designed, built and installed
- EC fan integration for energy-efficient operation
- Full system commissioned and proven before handover