The Shard cooling tower control upgrade
← Projects

The Shard cooling tower control upgrade

Existing cooling tower control panel removed and replaced with a new bespoke panel, stainless steel containment and fully commissioned EC fan control.

Client

The Shard

Location

London Bridge, London

Year

2026

Value

Bespoke panel & controls

The challenge

The cooling tower controls had reached the end of their serviceable life on one of the most demanding buildings in London, with no room for extended downtime or untidy workmanship in an exposed rooftop environment.

What we did

We removed the existing panel, then designed, manufactured and installed a replacement bespoke control panel. New stainless steel containment and field cabling were installed, EC cooling tower fans integrated and the complete system commissioned.

Outcome

  • New bespoke control panel designed, built and installed
  • EC fan integration for energy-efficient operation
  • Full system commissioned and proven before handover

On site

New control panel installed and energised alongside live plant
New control panel installed and energised alongside live plant
Panel internals built for maintainability and clear labelling
Panel internals built for maintainability and clear labelling

Get started

Let's talk about
your building

Tell us what the building needs to do. We'll tell you what it takes - design, installation, commissioning, electrical works and maintenance from one team.

01DesignSpecs, points lists and drawings
02BuildInstallation and electrical works
03DeliverInstall, commission, maintain

London & the South East - 24/7 reactive cover