Neatly installed galvanised containment, insulated LTHW pipework and pump isolators in a compact plant room
← Projects

Nearing completion

LTHW plant room & ASHP installation: full BMS design and delivery

Big results in small spaces: a complete BMS for a compact LTHW plant room with external air source heat pumps, designed, built, installed and commissioned by EcoNex.

Client

Commercial heating project

Location

Compact LTHW plant room

Year

2026

Scope

End-to-end BMS

The project

Another project nearing completion for the EcoNex team: a complete Building Management System for a compact Low Temperature Hot Water (LTHW) plant room, incorporating external Air Source Heat Pumps (ASHPs). With extremely restricted working space, there was barely room to swing a cat, let alone install a complete BMS. Careful planning, attention to detail and excellent workmanship meant we delivered a high-quality installation without compromising on standards.

Progress on site

A complete end-to-end BMS solution, delivered entirely by EcoNex. We carried out the full controls design and wrote the Description of Operations (DesOps), then designed, built and tested a bespoke BMS control panel in our own workshop. On site, our engineers precision-installed the containment, field wiring and controls integration, making the most of every available millimetre, and integrated the internal heating plant with the external air source heat pumps. Even in the tightest spaces, neatness, accessibility and quality stayed a priority.

What comes next

  • Commissioning, functional testing and witnessing to demonstrate correct operation.
  • Full commissioning records, test documentation, as-built information and handover paperwork.
  • Handover of another professionally delivered, fully integrated BMS installation.

On site

Galvanised containment framing insulated LTHW pipework, pumps and isolators in a tight plant room
Containment and controls built around the plant in a very tight space.
Labelled pressurisation unit and secondary pump isolators beside twin circulating pumps
Clearly labelled isolators for the pressurisation unit and secondary pumps.
Twin pumps with neatly dressed flexible conduit dropping from galvanised trunking
Field wiring dressed neatly from the containment to the pumps.
Bespoke BMS control panel with touchscreen beside leak detection and primary pump isolators
Our bespoke BMS control panel, designed and built in house.
Powered-up MCC panel with indicator lamps and touchscreen in the LTHW plant room
The panel powered up, ready for commissioning and witnessing.

Get started

Let's talk about
your building

Tell us what the building needs to do. We'll tell you what it takes - design, installation, commissioning, electrical works and maintenance from one team.

01DesignSpecs, points lists and drawings
02BuildInstallation and electrical works
03DeliverInstall, commission, maintain

London & the South East - 24/7 reactive cover